VKG
Coordinate VKG selection with the operating point and outdoor roof installation.
The base and roof penetration must be coordinated with the equipment and roof construction. Provide inspection access and a connection that does not place loads on the fan.
What to check to choose
- VKG Code
- Allowed external conditions
- power supply and support
How to prepare the consultation
- Identify the equipment, connection or installation point where it will be used.
- Contrast measurements, working conditions and reference with system documentation.
- Check accessories, assembly and maintenance before confirming the selection.
Frequently asked questions
Does the same base serve for any deck?
No. Check the geometry, fixings, encounter with waterproofing and compatibility with the fan reference.
What information does the consultation of this category make?
Provide the following information: VKG Code; Allowed external conditions; power supply and support. Add the product reference and photographs of the site or existing component, where applicable.











